Services

Deck Building and Construction

Deck builds and rebuilds in wood and composite, fastened with hardware that survives salt air.

Get a Free Estimate
Decks

This is for you if…

  • You want outdoor living space that's still solid and safe five summers from now.
  • Your current deck has soft boards, popped fasteners, or wobbly rails.
  • You're weighing wood against composite and want the honest math for a salt-air environment.

And honestly, not if…

  • Second-story structural additions or anything tied into the home's frame in a load-bearing way — that's structural work and we don't do it.
  • A deck priced by using interior-grade screws outside. Near salt water, cheap fasteners are the first thing to fail.

What it is

Ground-level and low-elevation deck construction, replacement, and re-decking in pressure-treated wood and composite. Salt air is the quiet enemy of a coastal deck — it corrodes fasteners and connectors long before the boards wear out. We build with hot-dip galvanized or stainless hardware and set posts for sandy soil, per the manufacturer's published instructions for every connector and board we install.

Problems this solves

  • Rusting screws and connectors staining and weakening the deck — replaced with coastal-rated hardware.
  • Boards cupping and splintering — solved with proper gapping, ventilation underneath, and material choice.
  • A deck project that stalls after demo — we work it daily to the final rail.

What's included

  • Design layout walked on-site with you
  • Demo and haul-away of the old deck
  • Posts and framing sized for sandy soil
  • Wood or composite decking, your pick after an honest comparison
  • Rails, stairs, and gates with salt-rated hardware
  • Final walk-around and care guidance for the material you chose

How the job runs

Every project follows the same sequence: a free estimate, then a written scope and start date, a pre-construction meeting before we pull out a tool, work on your job every full workday with photo updates, and a final walk-around with you before we pull out. The full process is here.

What affects the timeline

  • Deck size and shape
  • Wood versus composite
  • Rail length and stair count
  • Soil and post depth
  • Old deck removal

The same factors drive cost — explained in plain terms here, with no figures, because your written estimate is the real number.

Decks questions

More in the full FAQ.

Ready to talk about your decks project?

Free estimate, written scope, written start date. The owner walks your project with you — and answers his phone after.